Tell us about your bathroom and we'll arrange a visit to look at the room, talk through your ideas and plan dates that work around the holidays.
Is winter a good time to renovate a bathroom?
Renovating a bathroom in winter? See how the cold affects tiles and grout, how to plan around Christmas deliveries, and what to check before work starts.

By Riverside Construction Group
Yes, winter can be a good time to renovate a bathroom, as long as the room is kept warm enough for tiles, grout and sealant to set, and the work is planned around Christmas. The cold doesn't stop the job, but it changes how it needs to be run.
This post covers what the cold affects, how to plan around the holidays and deliveries, what it's like living with the work on chilly days, and a few simple checks you can make before work starts. Most of it is planning. The plumbing, electrics and any gas work are always jobs for qualified people.
Why winter can work well
A bathroom refit happens indoors, so rain and wind rarely hold it up the way they can with an extension or roof work. And if you'd like a new bathroom in time for spring or summer guests, the winter months are when the design, choosing and ordering need to happen anyway.
Winter also shows up problems you might miss in summer, such as a bathroom radiator that never quite warms up or a window that lets in a draught. Note them down so they can be fixed as part of the job.
What the cold affects
The biggest effect is on tiling. Cement-based tile adhesives and grouts need the air, and the wall or floor itself, to be at least 5°C and rising. Below that they barely set. Even above it, cold slows things down: a standard adhesive that sets in about a day at 20°C can still be soft a week later in a cold room.
Plaster, sealant and paint also dry more slowly in cold, damp air. Drying plaster gives off a lot of moisture, so the room needs both warmth and some airflow to stop condensation forming on cold windows and walls.
In practice, that means:
the bathroom is kept heated before, during and after tiling
tiles, adhesive and grout are stored somewhere warm for a day or two before they're used, not in a cold garage or shed
the new shower isn't used until the grout and sealant have fully set, following the makers' instructions
Keeping warm while the radiator is off
The old radiator or towel rail often comes off early so the wall behind it can be plastered or tiled. A plumber can usually close the valves on either side so the rest of the house stays heated. Sometimes the heating has to be drained for a short time to move pipes, so ask how long you'll be without it and plan that for a milder day if you can.
Ask how the room will be kept warm while the tiles set. Tile makers advise dry heat, such as an electric warm-air heater, and warn against open-flame heaters like gas or paraffin, which add moisture to the air.
Keep the heating on in the rest of the house too, even if you're away for a few days. With floorboards up or a wall opened, pipes near an outside wall are more exposed than usual in a hard frost. Our guide on what to do first when a pipe bursts is worth reading before the cold snaps.
Planning around Christmas and deliveries
Suppliers and couriers close or slow down over Christmas and New Year, and many items are made to order. Vanity units, shower screens and some tiles can take several weeks to arrive. A late or damaged delivery in mid-December can leave a bathroom half-finished until January.
The safest approach is to have everything delivered, unpacked and checked before work begins. Our bathroom renovation checklist explains what to order and when.
If you're hosting over the holidays and only have one bathroom, it's usually better to finish well before Christmas or start in the new year, rather than have the work run across it.
Thinking about the boiler too
Winter is when an old boiler is under most strain. If yours is also due for replacing, it's worth planning both jobs together, because the type of boiler you choose affects which shower suits your bathroom.
Try not to change the boiler while the bathroom is being tiled, though. A new boiler means a day or more without heating or hot water while it's fitted, just when the room needs to stay warm. Gas work must only be done by a Gas Safe registered engineer. Our boiler installation service covers that side.
Safe checks before work starts
You can make these checks without touching anything risky:
Find your stop tap and check it turns. It's often under the kitchen sink. If it's stiff, don't force it. Tell your installer instead.
Check every radiator warms up. Note any that stay cold at the top or bottom, so the heating can be looked at during the work.
Clear a warm, dry space for materials. A spare room or hallway is better than a garage in winter.
Plan how you'll manage without the bathroom. If you have only one, ask how long you'll be without a working toilet and shower.
Everything beyond these checks is for your installer. Any electrical work in a bathroom, such as new lighting or an extractor fan, must follow Part P of the Building Regulations. Riverside Construction Group is Gas Safe registered and NICEIC approved, so both the gas and electrical sides of the job are covered.
If you're thinking about a new bathroom this winter, Riverside Construction Group can visit, look at the room and your heating, and help you plan dates around the holidays. Find out more about our bathroom installation service.